With its wind turbines built in between each floor, and the claims that the building will generate 10 times more energy than required to power it. The new tower is the first building of its size to be produced in a factory. Each floor, made up of 12 individual units, complete with plumbing, electric connections, air conditioning, etc., will be fabricated in a factory. These modular units will be fitted on the concrete core or spine of the building at the central tower..
Article Link: www.treehugger.com
Video Link: www.youtube.com